MOWGLY - MObile Wideband Global Link sYstem
Home PageContact
MOWGLY overviewMOWGLY PartnersWork descriptionPublicationsNewsExperimentations
WP 1000
WP 2000
WP 3000
WP 4000
WP 5000
WP 6000
WP 7000
WP 8000
Work Package 3000: System engineering

The objective of the WP3000 is to specify the industrial system based on the commercial requirements produced in the WP2000 and the performance feedback provided by the WP5000, 6000 and 7000.

A full technical definition will be available at system level for the requirements and architecture. At sub-system level the requirements definition will be available. After this phase, detailed design could be started in the frame of industrial product development (see roadmap and development plan).
The outputs of the WP3000 will be the following one:

  • All the technical features to be developed will be defined and evaluated.
  • Non-recurrent and recurrent cost of the sub-systems will be known.
  • Detailed development plan will be written.
  • Deployment cost including regulation and licensing will be known.
  • System performances will be evaluated.